← Back to map

River Mountains Solar

Clark County, Nevada · EIA plant ID 59747 · Operator: River Mountains Solar, LLC
SolarSolar PhotovoltaicBA: NEVP
Nameplate14MWSummer 14 MW
Generators1in service
Net generation31GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202625.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20163527.7%—
201735.127.8%—
201834.127.0%—
201933.826.8%—
202034.527.3%—
202128.922.9%—
202223.318.4%—
202328.922.9%—
202433.626.5%—
202530.825.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV14.413.7Jan 2016Operating—coming soon

Owner / operator

Operator: River Mountains Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
River Mountains Solar, LLC100.0%14 MW

Nearby plants

Within 80 km.
Saguaro Power127 MW7.5 km
Townsite Solar Project Hybrid270 MW11.3 km
Clark (NVE)1,376 MW12.6 km
Techren Solar V50 MW14.7 km
Las Vegas WPCF Solar Plant3 MW14.9 km
Sun Peak Generating Station222 MW15.1 km