Pavant Solar, LLC
Millard County, Utah · EIA plant ID 59702 · Operator: Novatus Energy
Nameplate50MWSummer 50 MW
Generators1in service
Net generation112GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2015
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 1.4 | 3.7% | — |
| 2016 | 115.6 | 26.3% | — |
| 2017 | 118 | 26.9% | — |
| 2018 | 121.7 | 27.8% | — |
| 2019 | 101 | 23.1% | — |
| 2020 | 119.3 | 27.2% | — |
| 2021 | 108.3 | 24.7% | — |
| 2022 | 102 | 23.3% | — |
| 2023 | 99 | 22.6% | — |
| 2024 | 110.1 | 25.1% | — |
| 2025 | 114.3 | 26.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 50 | 50 | Dec 2015 | Operating | — | coming soon |
Owner / operator
Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Novatus Energy | 100.0% | 50 MW |
Nearby plants
Within 80 km.
| Pavant Solar III | 20 MW | 21.6 km |
| Pavant Solar II LLC | 50 MW | 22.5 km |
| Sigurd Solar LLC | 80 MW | 33.3 km |
| Enel Cove Fort | 25 MW | 48.3 km |
| Intermountain Pumped Storage Project | — | 50.9 km |
| Gunnison Solar | 2 MW | 53.7 km |