Gunnison Solar
Sanpete County, Utah · EIA plant ID 65618 · Operator: Altus Power America Management, LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 1 | 23.7% | — |
| 2023 | 3.9 | 29.7% | — |
| 2024 | 3.7 | 28.0% | — |
| 2025 | 3.8 | 29.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 524 | Solar Photovoltaic | PV | 1.5 | 1.5 | Sep 2022 | Operating | — | coming soon |
Owner / operator
Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Altus Power America Management, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Manti Upper | 1 MW | 18.3 km |
| Manti Lower | 1 MW | 18.3 km |
| Sigurd Solar LLC | 80 MW | 39.4 km |
| Hydro Plant No 3 | 3 MW | 40.4 km |
| Pavant Solar II LLC | 50 MW | 46.7 km |
| Pavant Solar III | 20 MW | 48.2 km |