AP North Lake I, LP

Riverside County, California · EIA plant ID 59610 · Operator: AP North Lake I, LP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 19 MW
Generators1in service
Net generation46GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202628.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20151520.5%—
20174224.0%—
20184626.3%—
201942.624.3%—
202043.424.7%—
202132.318.4%—
202231.117.7%—
202327.615.8%—
202439.622.6%—
202545.728.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
APNLISolar PhotovoltaicPV2018.5Aug 2015Operating—coming soon

Owner / operator

Operator: AP North Lake I, LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AP North Lake I, LP100.0%20 MW

Nearby plants

Within 80 km.
West Valley High School Solar1 MW2.3 km
Tahquitz High School1 MW3.1 km
Diamond Valley Solar Project1 MW6.5 km
EMWD - San Jacinto RWRF NEM1 MW6.5 km
EMWD - San Jacinto RES BCT4 MW7.1 km
Diamond Valley Lake30 MW8.6 km