← Back to map

West Valley High School Solar

Riverside County, California · EIA plant ID 58244 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2012201420162018202020222024202616.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120.311.0%—
20131.517.4%—
20141.617.7%—
20151.517.1%—
20161.518.9%—
20171.418.3%—
20181.417.8%—
20191.418.2%—
20201.518.4%—
20211.518.6%—
20221.518.4%—
20231.417.6%—
20241.316.1%—
20251.316.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WESTSolar PhotovoltaicPV10.9Sep 2012Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%1 MW

Nearby plants

Within 80 km.
AP North Lake I, LP20 MW2.3 km
Tahquitz High School1 MW5.3 km
Diamond Valley Solar Project1 MW5.9 km
Diamond Valley Lake30 MW7 km
EMWD - San Jacinto RWRF NEM1 MW8.8 km
EMWD - San Jacinto RES BCT4 MW9.3 km