Keen Farm

Johnston County, North Carolina · EIA plant ID 59565 · Operator: strata manager, llc
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202620.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20150.2——
20169.221.0%—
20179.621.8%—
2018920.6%—
2019920.5%—
20208.419.2%—
20218.920.4%—
20229.120.8%—
20238.820.2%—
20249.321.1%—
20259.120.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV55Dec 2015Operating—coming soon

Owner / operator

Operator: strata manager, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Keen Farm, LLC100.0%5 MW

Nearby plants

Within 80 km.
4Oaks5 MW1.2 km
ESA Four Oaks 2 NC LLC2 MW1.4 km
Langdon Solar Farm, LLC5 MW2.6 km
CII Methane Management IV, LLC2 MW10 km
ESA Smithfield2 MW10 km
Nitro Solar5 MW10.3 km