Johnston County, North Carolina · EIA plant ID 59534 · Operator: USF Surry, LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202611.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20153.817.4%—
20169.421.3%—
20172.76.3%—
20187.817.9%—
20196.414.5%—
20208.419.0%—
20218.419.2%—
20228.118.6%—
20238.318.9%—
20247.316.6%—
20255.211.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4OAKSSolar PhotovoltaicPV55Jul 2015Operating—coming soon

Owner / operator

Operator: USF Surry, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
USF Surry, LLC100.0%5 MW

Nearby plants

Within 80 km.
Keen Farm5 MW1.2 km
Langdon Solar Farm, LLC5 MW1.7 km
ESA Four Oaks 2 NC LLC2 MW1.8 km
CII Methane Management IV, LLC2 MW9.1 km
Happy Solar4 MW9.8 km
ESA Smithfield2 MW10.4 km