Vega Solar

Merced County, California · EIA plant ID 59555 · Operator: Vega Solar, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation49GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202628.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201530.720.9%—
201652.329.8%—
201750.929.1%—
201851.429.3%—
201949.228.1%—
202043.124.5%—
20215028.5%—
20224726.9%—
202347.727.3%—
202451.129.1%—
202549.328.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
VEGA1Solar PhotovoltaicPV2020Mar 2015Operating—coming soon

Owner / operator

Operator: Vega Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Vega Solar, LLC100.0%20 MW

Nearby plants

Within 80 km.
Zeta Solar & Storage—1.8 km
Merced BESS—8.7 km
Lara 2 Hybrid2 MW8.8 km
Merced 1 PV3 MW8.8 km
Oro Loma20 MW14.6 km
Althea Avenue Solar5 MW15 km