← Back to map

Mitchell Solar, LLC

San Bernardino County, California · EIA plant ID 59411 · Operator: CD US Solar PO 3, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202633.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20140.18.1%—
20154.131.3%—
20164.534.0%—
20174.332.7%—
20183.930.0%—
2019430.1%—
20203.627.5%—
20211.914.7%—
20223.828.6%—
20232.619.6%—
20243.728.1%—
20254.433.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SNL18Solar PhotovoltaicPV1.51.5Dec 2014Operating—coming soon

Owner / operator

Operator: CD US Solar PO 3, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD US Solar PO 3, LLC100.0%2 MW

Nearby plants

Within 80 km.
Rudy Solar, LLC2 MW0.2 km
Madelyn Solar, LLC1 MW0.4 km
Alamo Solar20 MW9.5 km
Hudson - High Desert Hybrid150 MW15 km
High Desert Power Plant960 MW19.2 km
Expressway Solar C22 MW20.1 km