← Back to map

City of Tulare Water Facility

Tulare County, California · EIA plant ID 59395 · Operator: City of Tulare Water Pollution Control
SolarOther Natural GasOther Waste BiomassSolar PhotovoltaicCAISOBA: CISO
Nameplate9MWSummer 9 MW
Generators4in service
Net generation16GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate14,624Btu/kWhfossil units, electric fuel, HHV
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh20142015201620172018201920202021202220242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201420162018202020222024202611.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,00014,00020182019202020212022202320242025202614,624 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2014619.8%—
20157.219.8%—
20164.918.6%—
20171.314.9%—
20182.10.0%8,535
201917.11.7%9,068
202019.844.7%12,338
202124.514.4%11,894
202223.914.3%9,638
202420.711.8%13,616
202516.311.0%14,624

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MM26Other Natural GasFC2.82.8May 2018Operating—coming soon
MM27Other Waste BiomassFC32.8Dec 2019Operating—coming soon
SC500Solar PhotovoltaicPV11Feb 2011Operating—coming soon
SOLARSolar PhotovoltaicPV2.42.2Jan 2020Operating—coming soon
C2550Other Waste BiomassIC0.50.4Jan 1991Retired Dec 2018—coming soon
DFC30Other Waste BiomassFC1.41.1Sep 2007Retired Aug 2017—coming soon
PV302Solar PhotovoltaicPV0.10.1Oct 2007Retired Dec 2016—coming soon

Owner / operator

Operator: City of Tulare Water Pollution Control. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Fuel Cell Energy32.6%3 MW
Clearway Energy, Inc30.4%3 MW
Borrego Solar Systems Inc26.1%2 MW
City of Tulare Water Pollution Control10.9%1 MW

Nearby plants

Within 80 km.
Central CA Fuel Cell 13 MW0.2 km
Tulare BioMAT Fuel Cell3 MW0.2 km
1875 West Street Solar2 MW0.8 km
Tulare 1 and 23 MW4.4 km
TWC1 MW9.5 km
Government Plaza Solar1 MW11.6 km