← Back to map

Rio Bravo Solar II LLC

Kern County, California · EIA plant ID 59250 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation52GWh12 mo to Dec 2025
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202630.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.10.7%—
201753.631.4%—
20185230.4%—
201949.629.0%—
202045.926.8%—
202149.829.2%—
202246.927.5%—
20234828.1%—
202450.829.6%—
202551.730.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV2019.5Dec 2016Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%20 MW

Nearby plants

Within 80 km.
Rio Bravo Solar 1 LLC20 MW4.9 km
Cymric 31X Cogen7 MW7.1 km
South Belridge Cogeneration Facility94 MW7.3 km
Cymric 36W Cogen12 MW7.8 km
Welport Lease Project5 MW8.1 km
Cymric 6Z Cogen7 MW8.6 km