← Back to map

Rio Bravo Solar 1 LLC

Kern County, California · EIA plant ID 59249 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation52GWh12 mo to Dec 2025
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202630.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.74.8%—
201753.831.5%—
201852.330.6%—
201949.128.7%—
202045.426.5%—
202148.328.3%—
202246.327.1%—
202346.527.2%—
202452.330.6%—
202552.130.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV2019.5Dec 2016Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%20 MW

Nearby plants

Within 80 km.
South Belridge Cogeneration Facility94 MW3.4 km
Rio Bravo Solar II LLC20 MW4.9 km
Cymric 36W Cogen12 MW5.9 km
Cymric 31X Cogen7 MW6.2 km
Welport Lease Project5 MW7.1 km
Cymric 6Z Cogen7 MW8.6 km