Wildcat Point Generation Facility
Cecil County, Maryland · EIA plant ID 59220 · Operator: Old Dominion Electric Coop
Nameplate1,114MWSummer 991 MW
Generators3in service
Net generation3,019GWh12 mo to Aug 2026
Capacity factor35%gas/coal/oil units, summer MW
Heat rate7,069Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 245.8 | — | 13,624 |
| 2018 | 3,785.3 | 51.5% | 7,109 |
| 2019 | 3,351 | 39.1% | 7,025 |
| 2020 | 3,023.1 | 35.2% | 6,912 |
| 2021 | 3,462.3 | 40.5% | 6,964 |
| 2022 | 3,922.6 | 45.2% | 6,977 |
| 2023 | 4,424.9 | 51.0% | 6,930 |
| 2024 | 2,968.2 | 34.1% | 7,067 |
| 2025 | 3,333.4 | 38.4% | 7,027 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CT1 | Natural Gas Fired Combined Cycle | CT | 310.3 | 252.3 | Apr 2018 | Operating | — | coming soon |
| CT2 | Natural Gas Fired Combined Cycle | CT | 310.3 | 241.1 | Apr 2018 | Operating | — | coming soon |
| ST1 | Natural Gas Fired Combined Cycle | CA | 493 | 497.9 | Apr 2018 | Operating | — | coming soon |
Owner / operator
Operator: Old Dominion Electric Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Old Dominion Electric Coop | 100.0% | 1,114 MW |
Nearby plants
Within 80 km.
| NAEA Rock Springs LLC | 796 MW | 0.2 km |
| Conowingo | 531 MW | 7 km |
| Peach Bottom | 2,876 MW | 10.2 km |
| 100a Swiss Dale Farm | — | 11.4 km |
| York Energy Center | 1,449 MW | 12.6 km |
| Muddy Run | 1,072 MW | 15.3 km |