Bradley PV1
Hertford County, North Carolina · EIA plant ID 59154 · Operator: strata manager, llc
Nameplate5MWSummer 5 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2015
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 0 | 0.0% | — |
| 2016 | 5.5 | 12.4% | — |
| 2017 | 5.6 | 12.9% | — |
| 2018 | 7.8 | 17.9% | — |
| 2019 | 8 | 18.3% | — |
| 2020 | 7 | 15.9% | — |
| 2021 | 7.9 | 17.9% | — |
| 2022 | 7.9 | 17.9% | — |
| 2023 | 7.7 | 17.7% | — |
| 2024 | 7.7 | 17.6% | — |
| 2025 | 5.9 | 13.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRAD1 | Solar Photovoltaic | PV | 5 | 5 | Dec 2015 | Operating | — | coming soon |
Owner / operator
Operator: strata manager, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Fresh Air Energy IX LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Aulander Hwy 42 Solar, LLC | 5 MW | 1.6 km |
| Baker PV 1 | 5 MW | 1.8 km |
| Aulander Holloman Solar, LLC | 99 MW | 3.5 km |
| Hertford Solar Power, LLC | 10 MW | 4.4 km |
| Simons Farm | 5 MW | 8.7 km |
| Ahoskie | 5 MW | 9 km |