Cottonwood Solar, LLC (Goose Lake)

Kern County, California · EIA plant ID 59086 · Operator: Novatus Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate12MWSummer 12 MW
Generators1in service
Net generation30GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202628.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201524.334.4%—
201635.233.4%—
201734.933.2%—
201834.332.6%—
201932.330.7%—
202031.429.8%—
202133.231.6%—
202232.831.2%—
202325.324.1%—
202431.529.9%—
202529.928.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV1212May 2015Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%12 MW

Nearby plants

Within 80 km.
Flying Goose3 MW0.7 km
Wildwood Solar I, LLC20 MW2.5 km
Wildwood Solar II15 MW4.1 km
Chevron - Lost Hills Hybrid30 MW10.4 km
Nickel 1 Solar Facility2 MW13.7 km
Wingmaster2 MW13.9 km