Jericho Power

Coos County, New Hampshire · EIA plant ID 59070 · Operator: Jericho Power LLC
WindOnshore Wind TurbineISONEBA: ISNE
Nameplate14MWSummer 12 MW
Generators1in service
Net generation24GWh12 mo to Aug 2026
Capacity factor22%wind units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh20162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202622.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201626.524.9%—
201726.525.0%—
201825.524.1%—
201920.119.0%—
202025.323.8%—
202124.723.3%—
202219.218.1%—
202311.911.2%—
202420.719.5%—
202522.621.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT 1Onshore Wind TurbineWT14.312.1Jan 2016Operating—ge 2.85-103

Owner / operator

Operator: Jericho Power LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Jericho Power LLC100.0%14 MW

Nearby plants

Within 80 km.
Smith (NH)15 MW3.7 km
Burgess BioPower75 MW4 km
Gorham2 MW6.9 km
Berlin Gorham44 MW9.9 km
Pontook Hydro Facility11 MW18.5 km
Lost Nation18 MW25.7 km