Burgess BioPower
Coos County, New Hampshire · EIA plant ID 58054 · Operator: Berlin Station, LLC
Nameplate75MWSummer 68 MW
Generators1in service
Net generation390GWh12 mo to Dec 2025
Capacity factor66%other units, summer MW
Heat rate14,034Btu/kWhfossil units, electric fuel, HHV
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 16.4 | 15.4% | 16,132 |
| 2014 | 285.3 | 48.0% | 14,271 |
| 2015 | 421.5 | 71.3% | — |
| 2016 | 525.1 | 88.5% | 13,472 |
| 2017 | 492.7 | 83.2% | 13,886 |
| 2018 | 499.3 | 84.4% | 13,947 |
| 2019 | 538.9 | 91.1% | 13,225 |
| 2020 | 514.7 | 86.7% | 13,576 |
| 2021 | 540.6 | 91.4% | 13,437 |
| 2022 | 540.6 | 91.4% | 13,647 |
| 2023 | 496.2 | 82.5% | 14,659 |
| 2024 | 348.6 | 58.8% | 14,006 |
| 2025 | 390.2 | 66.0% | 14,034 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ST01 | Wood/Wood Waste Biomass | ST | 75 | 67.5 | Nov 2013 | Operating | — | coming soon |
Owner / operator
Operator: Berlin Station, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Berlin Station, LLC | 100.0% | 75 MW |
Nearby plants
Within 80 km.
| Smith (NH) | 15 MW | 0.4 km |
| Jericho Power | 14 MW | 4 km |
| Gorham | 2 MW | 7.3 km |
| Berlin Gorham | 44 MW | 9.3 km |
| Pontook Hydro Facility | 11 MW | 18.8 km |
| Granite Reliable Power | 99 MW | 27.5 km |