← Back to map

RE Camelot LLC

Kern County, California · EIA plant ID 58983 · Operator: Novatus Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate45MWSummer 45 MW
Generators1in service
Net generation121GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202630.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201512932.7%—
2016131.833.3%—
2017126.832.2%—
2018130.233.0%—
2019123.731.4%—
202012431.4%—
202111629.4%—
2022120.530.6%—
2023117.629.8%—
2024125.131.6%—
202512130.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV4545Dec 2014Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%45 MW

Nearby plants

Within 80 km.
RE Columbia Two, LLC15 MW0 km
RE Columbia 3 LLC10 MW2 km
RE Rio Grande Solar LLC5 MW2.9 km
Difwind Farms Ltd VI27 MW3 km
Edwards Sanborn 1C148 MW3 km
Pinyon Pine I168 MW3 km