← Back to map

RE Columbia 3 LLC

Kern County, California · EIA plant ID 58502 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate10MWSummer 10 MW
Generators1in service
Net generation23GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202626.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201426.630.3%—
201525.829.4%—
201626.530.1%—
201725.228.8%—
201825.228.7%—
201922.926.1%—
20202326.2%—
202122.726.0%—
202220.823.8%—
202321.925.0%—
202423.927.2%—
202523.126.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
COL3Solar PhotovoltaicPV1010Jan 2014Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE Columbia 3 LLC100.0%10 MW

Nearby plants

Within 80 km.
Edwards Sanborn 1C148 MW1 km
RE Rio Grande Solar LLC5 MW1.9 km
RE Camelot LLC45 MW2 km
RE Columbia Two, LLC15 MW2 km
Sanborn BESS 2100 MW2.2 km
Sanborn BESS 3169 MW2.3 km