← Back to map

Beringer

Sonoma County, California · EIA plant ID 58890 · Operator: Solar Star Arizona II LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2009

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202612.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.617.1%—
20141.717.7%—
20151.717.6%—
20161.616.9%—
20171.616.9%—
20181.515.7%—
20191.212.9%—
20201.414.1%—
20211.616.3%—
20221.713.5%—
20231.310.8%—
20241.411.6%—
20251.612.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BERISolar PhotovoltaicPV1.41.4Jan 2009Operating—coming soon

Owner / operator

Operator: Solar Star Arizona II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solar Star Arizona II LLC100.0%1 MW

Nearby plants

Within 80 km.
Pacific Union College BESS1 MW7.3 km
Calistoga Resilency Center19 MW10.8 km
Keysight - Santa Rosa5 MW20.4 km
Santa Rosa Junior College Petaluma Solar1 MW21.6 km
Sonoma County Fuel Cellretired21.8 km
Sutter Santa Rosa Solar1 MW23.8 km