Keysight - Santa Rosa
Sonoma County, California · EIA plant ID 65199 · Operator: Bloom Energy
Nameplate5MWSummer 5 MW
Generators1in service
Net generation34GWh12 mo to Dec 2025
Capacity factor87%gas/coal/oil units, summer MW
Heat rate7,462Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 31 | 78.7% | 7,281 |
| 2022 | 33 | 83.8% | 7,148 |
| 2023 | 34.4 | 87.2% | 6,931 |
| 2024 | 12.8 | 32.3% | 7,105 |
| 2025 | 34.5 | 87.5% | 7,462 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| KST00 | Other Natural Gas | FC | 4.5 | 4.5 | Sep 2018 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Santa Rosa Junior College Petaluma Solar | 1 MW | 1.7 km |
| Sonoma County Fuel Cell | retired | 2 km |
| Sutter Santa Rosa Solar | 1 MW | 3.8 km |
| Windsor Floating Solar | 2 MW | 11.1 km |
| Laguna Water Reclamation Facility | 4 MW | 13.4 km |
| Calistoga Resilency Center | 19 MW | 16.2 km |