Keysight - Santa Rosa

Sonoma County, California · EIA plant ID 65199 · Operator: Bloom Energy
Natural gasOther Natural GasCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation34GWh12 mo to Dec 2025
Capacity factor87%gas/coal/oil units, summer MW
Heat rate7,462Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20212022202320242025202687.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,2007,4002021202220232024202520267,462 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20213178.7%7,281
20223383.8%7,148
202334.487.2%6,931
202412.832.3%7,105
202534.587.5%7,462

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KST00Other Natural GasFC4.54.5Sep 2018Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bloom Energy100.0%5 MW

Nearby plants

Within 80 km.
Santa Rosa Junior College Petaluma Solar1 MW1.7 km
Sonoma County Fuel Cellretired2 km
Sutter Santa Rosa Solar1 MW3.8 km
Windsor Floating Solar2 MW11.1 km
Laguna Water Reclamation Facility4 MW13.4 km
Calistoga Resilency Center19 MW16.2 km