← Back to map

Macksburg Wind Project

Madison County, Iowa · EIA plant ID 58885 · Operator: MidAmerican Energy Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate120MWSummer 120 MW
Generators1in service
Net generation249GWh12 mo to Dec 2025
Capacity factor24%wind units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202623.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201419.722.1%—
2015388.937.1%—
2016374.535.6%—
2017367.535.1%—
2018340.832.5%—
2019336.132.1%—
2020320.730.5%—
2021306.129.2%—
2022376.335.9%—
2023322.330.8%—
2024329.931.4%—
2025248.723.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MBWFOnshore Wind TurbineWT119.6119.6Dec 2014Operating—siemens SWT-2.3-108

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%120 MW

Nearby plants

Within 80 km.
Winterset18 MW16.1 km
Summit Lake119 MW23 km
Creston Solar (50 MW)50 MW23.7 km
Arbor Hill Wind Farm310 MW25.4 km
Orient Wind Farm501 MW26.2 km
Creston School Customer Hosted Solar1 MW27.2 km