Water Reclamation Plant

Olmsted County, Minnesota · EIA plant ID 58617 · Operator: City of Rochester
OtherOther Waste BiomassMISOBA: MISO
Nameplate2MWSummer 1 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor70%other units, summer MW
Heat rate7,102Btu/kWhfossil units, electric fuel, HHV
First online2003

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%201420162018202020222024202670.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,00020142016201820202022202420267,102 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20132.646.1%9,059
20144.279.1%9,047
20153.464.3%11,660
20163.770.0%7,409
20173.767.7%7,252
20182.854.1%7,322
20192.751.4%7,096
20201.731.6%—
20212.751.1%—
20222.954.9%7,116
20232.649.6%—
20243.974.9%8,757
20253.770.0%7,102

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Other Waste BiomassIC10.3Mar 2003Operating—coming soon
GEN2Other Waste BiomassIC10.3Aug 2008Operating—coming soon

Owner / operator

Operator: City of Rochester. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Rochester100.0%2 MW

Nearby plants

Within 80 km.
IBM West4 MW3.5 km
Saint Marys Hospital Power Plant16 MW3.8 km
Cascade Creek85 MW4 km
4710 Hosting8 MW4.3 km
Franklin Heating Station34 MW4.9 km
Olmsted Waste Energy11 MW5.2 km