Franklin Heating Station
Olmsted County, Minnesota · EIA plant ID 54224 · Operator: Franklin Heating Station
25 MW under construction · 3 MW planned (Natural Gas Fired Combined Cycle, Petroleum Liquids), first expected May 2027 · EIA-860M
×5 MW natural gas retired since 2020 (latest Feb 2021)
Nameplate34MWSummer 29 MW
Generators11in service · 25 MW building
Net generation63GWh12 mo to Aug 2026
Capacity factor19%gas/coal/oil units, summer MW
Heat rate4,554Btu/kWhfossil units, electric fuel, HHV
First online1951Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 60 | — | — |
| 2002 | 48.5 | — | — |
| 2003 | 49.2 | 26.1% | 4,609 |
| 2004 | 46.2 | 25.3% | 4,475 |
| 2005 | 46.7 | 25.7% | 4,474 |
| 2006 | 42.6 | 20.6% | 4,475 |
| 2007 | 37.4 | 20.6% | 4,475 |
| 2008 | 40.2 | 22.1% | 4,476 |
| 2009 | 64.8 | 24.4% | 4,475 |
| 2010 | 69.6 | 25.6% | 4,475 |
| 2011 | 63.4 | 22.0% | 4,475 |
| 2012 | 64.6 | 21.3% | 4,475 |
| 2013 | 62.2 | 22.4% | 4,475 |
| 2014 | 66 | 22.8% | 4,475 |
| 2015 | 66.5 | 22.4% | 4,476 |
| 2016 | 67.8 | 23.1% | 4,554 |
| 2017 | 59.1 | 19.1% | 4,554 |
| 2018 | 64.6 | 23.9% | 4,554 |
| 2019 | 54.6 | 18.9% | 4,554 |
| 2020 | 65 | 20.1% | 4,554 |
| 2021 | 72.1 | 27.4% | 4,555 |
| 2022 | 72.5 | 23.8% | 4,554 |
| 2023 | 62.4 | 21.0% | 4,554 |
| 2024 | 59.4 | 19.4% | 4,554 |
| 2025 | 64.9 | 23.6% | 4,554 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DG10 | Petroleum Liquids | IC | 3.1 | 3.1 | Jul 2021 | Operating (Standby / backup) | — | coming soon |
| DG4 | Petroleum Liquids | IC | 2 | 2 | May 2009 | Operating | — | coming soon |
| DG5 | Petroleum Liquids | IC | 2 | 2 | Apr 2011 | Operating | — | coming soon |
| DG8 | Petroleum Liquids | IC | 3.1 | 3.1 | Dec 2021 | Operating (Standby / backup) | — | coming soon |
| EG1 | Petroleum Liquids | IC | 2 | 2 | Jun 2001 | Operating (Standby / backup) | — | coming soon |
| EG2 | Petroleum Liquids | IC | 2 | 2 | Jun 2001 | Operating (Standby / backup) | — | coming soon |
| EG3 | Petroleum Liquids | IC | 2 | 2 | Jun 2001 | Operating (Standby / backup) | — | coming soon |
| GEN1 | Natural Gas Steam Turbine | ST | 2.5 | 2 | Jan 1951 | Operating | — | coming soon |
| GEN2 | Natural Gas Steam Turbine | ST | 2.5 | 2 | Jan 1951 | Operating | — | coming soon |
| GEN3 | Natural Gas Steam Turbine | ST | 6.3 | 6.1 | Jan 1968 | Operating | — | coming soon |
| GEN6 | All Other | ST | 6.5 | 2.8 | Jan 2006 | Operating | — | coming soon |
| CTG1 | Natural Gas Fired Combined Cycle | CT | 7.5 | 7.3 | planned May 2027 | Under construction | — | coming soon |
| EG11 | Petroleum Liquids | IC | 3.4 | 3.4 | planned May 2027 | Under construction | — | coming soon |
| EG12 | Petroleum Liquids | IC | 3.4 | 3.4 | planned May 2027 | Under construction | — | coming soon |
| EG13 | Petroleum Liquids | IC | 3.4 | 3.4 | planned May 2027 | Under construction | — | coming soon |
| EG14 | Petroleum Liquids | IC | 3.4 | 3.4 | planned May 2027 | Under construction | — | coming soon |
| EG15 | Petroleum Liquids | IC | 3.4 | 3.4 | planned May 2027 | Under construction | — | coming soon |
| DG9 | Petroleum Liquids | IC | 3.1 | 3.1 | planned Jan 2028 | Planned | — | coming soon |
| GEN4 | Natural Gas Internal Combustion Engine | IC | 2.4 | 2.3 | Jan 1982 | not_current | — | coming soon |
| GEN5 | Natural Gas Internal Combustion Engine | IC | 2.4 | 2.3 | Jan 1982 | not_current | — | coming soon |
| DG6 | Natural Gas Internal Combustion Engine | IC | 2.4 | 2.3 | Jan 1982 | Retired Feb 2021 | — | coming soon |
| DG7 | Natural Gas Internal Combustion Engine | IC | 2.4 | 2.3 | Jan 1982 | Retired Jan 2021 | — | coming soon |
Owner / operator
Operator: Franklin Heating Station. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Franklin Heating Station | 100.0% | 34 MW |
Nearby plants
Within 80 km.
| Cascade Creek | 85 MW | 2.4 km |
| Olmsted Waste Energy | 11 MW | 2.7 km |
| Water Reclamation Plant | 2 MW | 4.9 km |
| IBM West | 4 MW | 5.6 km |
| 4710 Hosting | 8 MW | 7.2 km |
| Westside Energy Station | 47 MW | 7.2 km |