← Back to map

Solar Gen 2 Solar Facility

Imperial County, California · EIA plant ID 58592 · Operator: Southern Power Co
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate163MWSummer 150 MW
Generators3in service
Net generation377GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202628.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201419.48.8%—
2015418.829.3%—
2016418.431.8%—
2017405.430.9%—
2018385.129.3%—
201938028.9%—
2020395.130.0%—
2021384.829.3%—
2022404.530.8%—
2023376.528.7%—
2024364.227.6%—
2025376.728.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ALHMSolar PhotovoltaicPV54.450Nov 2014Operating—coming soon
ARKSolar PhotovoltaicPV54.450Nov 2014Operating—coming soon
SONRSolar PhotovoltaicPV54.450Nov 2014Operating—coming soon

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SG2 Imperial Valley, LLC100.0%163 MW

Nearby plants

Within 80 km.
Arrowleaf Solar and Storage77 MW8.2 km
Valencia 23 MW8.3 km
Calipatria State Prison6 MW9.3 km
North Brawley Geothermal Plant80 MW10.1 km
CE Turbo LLC12 MW10.4 km
Midway Solar Farm II30 MW10.8 km