← Back to map

Calipatria State Prison

Imperial County, California · EIA plant ID 64521 · Operator: Ecoplexus, Inc
SolarSolar PhotovoltaicBA: IID
Nameplate6MWSummer 6 MW
Generators1in service
Net generation17GWh12 mo to Dec 2025
Capacity factor32%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202020212022202320242025202632.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202013.225.1%—
202117.232.8%—
202217.232.7%—
202317.833.9%—
202416.531.3%—
202516.932.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CALSPSolar PhotovoltaicPV66Dec 2019Operating—coming soon

Owner / operator

Operator: Ecoplexus, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ecoplexus, Inc100.0%6 MW

Nearby plants

Within 80 km.
CE Turbo LLC12 MW2.5 km
Midway Solar Farm II30 MW4.4 km
Calipatria Solar Farm20 MW4.4 km
Midway Solar Farm III20 MW5.7 km
Citizens Imperial Solar30 MW5.7 km
CE Leathers46 MW7.6 km