Bellingham PV

Worcester County, Massachusetts · EIA plant ID 58403 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202615.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20130.711.0%—
20144.517.0%—
20154.517.1%—
20164.617.3%—
20174.416.7%—
20184.115.8%—
20194.517.2%—
20204.717.7%—
20213.412.8%—
20223.513.5%—
20234.316.4%—
20244.316.4%—
20254.215.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SO032Solar PhotovoltaicPV33Oct 2013Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%3 MW

Nearby plants

Within 80 km.
Douglas Solar2 MW2.8 km
Upton Community Solar2 MW2.8 km
Sutton Solar CSG2 MW3.1 km
Sutton Solar 2, LLC CSG1 MW3.1 km
NEDC Solar Site1 MW3.4 km
Syncarpha Northbridge I Hybrid(CSG)9 MW6.1 km