← Back to map

NEDC Solar Site

Worcester County, Massachusetts · EIA plant ID 57270 · Operator: Massachusetts Electric Co
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150MWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20102012201420162018202020222024202612.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20100.613.5%—
2011114.4%—
20121.115.0%—
2013114.1%—
2014114.8%—
2015114.7%—
20161.115.7%—
2017114.0%—
2018114.2%—
2019114.6%—
20201.115.6%—
2021114.3%—
20221.115.8%—
20230.911.1%—
2024112.4%—
2025112.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV10.9Jun 2010Operating—coming soon

Owner / operator

Operator: Massachusetts Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Massachusetts Electric Co100.0%1 MW

Nearby plants

Within 80 km.
Sutton Solar 2, LLC CSG1 MW0.5 km
Sutton Solar CSG2 MW0.5 km
Upton Community Solar2 MW0.6 km
Bellingham PV3 MW3.4 km
Syncarpha Northbridge I Hybrid(CSG)9 MW4.6 km
Syncarpha Northbridge II Hybrid CSG8 MW5 km