← Back to map

CES Sterling LLC

Worcester County, Massachusetts · EIA plant ID 58387 · Operator: SunEdison LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202616.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20143.118.0%—
2015211.7%—
20163.419.4%—
20173.117.6%—
20182.916.7%—
20193.117.7%—
20203.519.8%—
20212.715.3%—
20223.319.0%—
20233.117.6%—
20243.218.0%—
20252.916.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV22Feb 2013Operating—coming soon

Owner / operator

Operator: SunEdison LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunEdison LLC100.0%2 MW

Nearby plants

Within 80 km.
Chocksett Rd Energy Storage Project2 MW1.7 km
MA Solar Storage 1 Hybrid2 MW1.9 km
Anderson Power Products Divisionretired3.7 km
Brockelman3 MW4.4 km
Brockelman Road Solar 23 MW4.8 km
Wachusett Solar2 MW4.8 km