Brockelman Road Solar 2
Worcester County, Massachusetts · EIA plant ID 65650 · Operator: brockelman road solar 2, llc
Nameplate3MWSummer 3 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 1.7 | — | — |
| 2022 | 2 | — | — |
| 2023 | 2 | — | — |
| 2024 | 2 | — | — |
| 2025 | 1.8 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 15446 | Solar Photovoltaic | PV | 1 | 1 | Aug 2021 | Operating | — | coming soon |
| 15447 | Batteries | BA | 2 | 2 | Sep 2021 | Operating | — | coming soon |
Owner / operator
Operator: brockelman road solar 2, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| brockelman road solar 2, llc | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Wachusett Solar | 2 MW | 0 km |
| Brockelman | 3 MW | 0.6 km |
| Nationwide | 4 MW | 2.6 km |
| AIS Solar Project | 3 MW | 3 km |
| Anderson Power Products Division | retired | 3 km |
| Chocksett Rd Energy Storage Project | 2 MW | 4.2 km |