Majestic II Wind

Carson County, Texas · EIA plant ID 58363 · Operator: NextEra Energy Majestic Wind
WindOnshore Wind TurbineERCOTBA: SWPP
Nameplate80MWSummer 80 MW
Generators1in service
Net generation180GWh12 mo to Dec 2025
Capacity factor26%wind units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201420162018202020222024202625.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2013342.949.2%—
2014332.647.7%—
2015293.542.1%—
2016286.841.0%—
2017296.642.5%—
2018348.350.0%—
2019327.947.0%—
2020338.648.4%—
2021326.746.9%—
2022282.140.5%—
2023180.725.9%—
2024157.422.5%—
2025179.625.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WND1Onshore Wind TurbineWT79.679.6Aug 2012Operating—ge 1.6 XLE

Owner / operator

Operator: NextEra Energy Majestic Wind. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NextEra Energy Majestic Wind100.0%80 MW

Nearby plants

Within 80 km.
Majestic 1 Wind Farm80 MW4.5 km
High Plains Wind Power LLCretired5.3 km
Pantex12 MW8.2 km
Project Matador Nuclear—11.4 km
Project Matador Gas Plant (PMG)—11.4 km
Harrington1,080 MW18.1 km