← Back to map

Ivanhoe Solar

Tulare County, California · EIA plant ID 58307 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators3in service
Net generation5GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202617.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20146.721.9%—
20156.922.7%—
20166.822.2%—
20176.621.5%—
20186.420.9%—
20196.621.5%—
20206.420.9%—
20216.521.1%—
20226.521.3%—
20235.116.8%—
20245.618.1%—
20255.317.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.51.5Jan 2014Operating—coming soon
2Solar PhotovoltaicPV0.50.5Jan 2014Operating—coming soon
3Solar PhotovoltaicPV1.51.5Jan 2014Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%4 MW

Nearby plants

Within 80 km.
Kaweah Delta District Hospital4 MW7.6 km
Civic Center East2 MW8.5 km
POM Juice Solar2 MW8.6 km
Visalia - (CA)5 MW8.9 km
Bob Wiley Detention Center2 MW9 km
Visalia CSG LLC3 MW9.1 km