← Back to map

POM Juice Solar

Fresno County, California · EIA plant ID 65706 · Operator: Wonderful Renewable Energy, LLC.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2022202320242025202627.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.21.1%—
20230.42.7%—
20243.224.5%—
20253.627.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PJSSolar PhotovoltaicPV1.51.5Jul 2021Operating—coming soon

Owner / operator

Operator: Wonderful Renewable Energy, LLC.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
POM Wonderful LLC100.0%2 MW

Nearby plants

Within 80 km.
POM Beverage Solar2 MW0.7 km
MM Tulare Energy2 MW3.9 km
Amazon Visalia (FAT2)4 MW4.9 km
Shirk Energy Storage80 MW5 km
Visalia Solar4 MW5.1 km
RE-VFO LLC1 MW6.2 km