Nameplate9MWSummer 9 MW
Generators1in service
Net generation23GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 13.5 | 31.0% | — |
| 2014 | 26 | 35.0% | — |
| 2015 | 25.5 | 34.2% | — |
| 2016 | 24.3 | 32.6% | — |
| 2017 | 25.6 | 34.4% | — |
| 2018 | 24.6 | 33.0% | — |
| 2019 | 24.5 | 32.9% | — |
| 2020 | 20.7 | 27.7% | — |
| 2021 | 22.2 | 29.8% | — |
| 2022 | 22.4 | 30.1% | — |
| 2023 | 24.4 | 32.8% | — |
| 2024 | 24.3 | 32.5% | — |
| 2025 | 23.1 | 31.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SPV9 | Solar Photovoltaic | PV | 9 | 8.5 | Jun 2013 | Operating | — | coming soon |
Owner / operator
Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Renewables Services | 100.0% | 9 MW |
Nearby plants
Within 80 km.
| MCAGCC Cogen Plant | 16 MW | 6 km |
| SEPV 2 | 2 MW | 6.1 km |
| SEPV 8 | 12 MW | 6.2 km |
| Cascade Solar | 19 MW | 13.8 km |
| Edom Hills Project 1 LLC | 20 MW | 48.5 km |