SEPV 2
San Bernardino County, California · EIA plant ID 58074 · Operator: CVI CleanCapital Solar 1 LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 1.8 | 17.8% | — |
| 2013 | 4.6 | 26.0% | — |
| 2015 | 4 | 22.7% | — |
| 2016 | 5.3 | 30.4% | — |
| 2017 | 4.4 | 24.8% | — |
| 2018 | 5 | 28.4% | — |
| 2019 | 4.4 | 25.4% | — |
| 2020 | 4 | 22.5% | — |
| 2021 | 3.8 | 21.8% | — |
| 2022 | 2.8 | 16.2% | — |
| 2023 | 4.4 | 25.3% | — |
| 2024 | 2.8 | 16.1% | — |
| 2025 | 3.1 | 17.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SEPV | Solar Photovoltaic | PV | 2 | 2 | Jun 2012 | Operating | — | coming soon |
Owner / operator
Operator: CVI CleanCapital Solar 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| BA Leasing BSC, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| SEPV 8 | 12 MW | 0.2 km |
| SEPV9 Power Plant | 9 MW | 6.1 km |
| Cascade Solar | 19 MW | 7.7 km |
| MCAGCC Cogen Plant | 16 MW | 11.5 km |
| Edom Hills Project 1 LLC | 20 MW | 43.1 km |
| Desert Hot Springs Solar | 2 MW | 44.6 km |