Energy Center
San Bernardino County, California · EIA plant ID 58168 · Operator: University of Redlands
1 MW planned (Natural Gas Fired Combustion Turbine), first expected Dec 2030 · EIA-860M
Nameplate1MWSummer 1 MW
Generators3in service
Net generation4GWh12 mo to Dec 2025
Capacity factor55%gas/coal/oil units, summer MW
Heat rate12,339Btu/kWhfossil units, electric fuel, HHV
First online2019Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 7.3 | 55.2% | 11,605 |
| 2013 | 9.9 | 75.2% | 11,485 |
| 2014 | 9.9 | 75.2% | 10,101 |
| 2015 | 9.9 | 75.7% | 11,606 |
| 2016 | 7.3 | 55.1% | 12,434 |
| 2017 | 6.9 | 52.8% | 8,501 |
| 2018 | 2.9 | 22.2% | 9,499 |
| 2019 | 3.2 | 49.7% | 12,434 |
| 2020 | 6.5 | 82.0% | 12,434 |
| 2021 | 6.5 | 82.1% | 12,435 |
| 2022 | 4.5 | 57.5% | 12,434 |
| 2023 | 4.7 | 60.2% | 12,186 |
| 2024 | 1.5 | 18.8% | 12,186 |
| 2025 | 4.4 | 55.3% | 12,339 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| TURB1 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | May 2019 | Operating | — | coming soon |
| TURB2 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | May 2019 | Operating | — | coming soon |
| TURB3 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | May 2019 | Operating | — | coming soon |
| TURB4 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | planned Dec 2030 | Planned | — | coming soon |
| TURB5 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | planned Dec 2030 | Planned | — | coming soon |
| TURB6 | Natural Gas Fired Combustion Turbine | GT | 0.3 | 0.3 | planned Dec 2030 | Planned | — | coming soon |
| EC01 | Natural Gas Internal Combustion Engine | IC | 1.5 | 1.5 | Feb 2007 | Retired Feb 2019 | — | coming soon |
Owner / operator
Operator: University of Redlands. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| University of Redlands | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Chambers 4 - Redland LGB4 | 2 MW | 4 km |
| Redlands DC 9 - sline609 | — | 4.3 km |
| Solar Photovoltaic Project #22 | retired | 4.8 km |
| Redlands Community Hospital | 1 MW | 4.9 km |
| Solar Photovoltaic Project #48 | retired | 6.2 km |
| Crafton Hills College Solar Farm | retired | 6.4 km |