BayWa r.e Mozart LLC
Kent County, Texas · EIA plant ID 58048 · Operator: Mozart Wind, LLC
Nameplate30MWSummer 30 MW
Generators1in service
Net generation50GWh12 mo to Dec 2025
Capacity factor19%wind units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 8.6 | 38.7% | — |
| 2013 | 84.6 | 32.2% | — |
| 2014 | 93.5 | 35.6% | — |
| 2015 | 76.2 | 29.0% | — |
| 2016 | 73 | 27.7% | — |
| 2017 | 78.7 | 29.9% | — |
| 2018 | 73.1 | 27.8% | — |
| 2019 | 75.3 | 28.6% | — |
| 2020 | 65.2 | 24.7% | — |
| 2021 | 58.7 | 22.4% | — |
| 2022 | 64.8 | 24.7% | — |
| 2023 | 59.1 | 22.5% | — |
| 2024 | 54.1 | 20.5% | — |
| 2025 | 49.5 | 18.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 30 | 30 | Dec 2012 | Operating | — | nordex N100/2500 |
Owner / operator
Operator: Mozart Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| BayWa r.e. USA, LLC | 100.0% | 30 MW |
Nearby plants
Within 80 km.
| Amadeus Wind Farm | 250 MW | 3.8 km |
| Lumina II Solar Project | 487 MW | 22.8 km |
| Snyder Wind Farm | retired | 32.5 km |
| Stonewall BESS | — | 32.9 km |
| Cross Trails Energy Storage Project | 58 MW | 33.1 km |
| Coyote Wind LLC | 243 MW | 34.7 km |