Coyote Wind LLC
Scurry County, Texas · EIA plant ID 63655 · Operator: EDF Renewable Asset Holdings, Inc.
Nameplate243MWSummer 243 MW
Generators1in service
Net generation702GWh12 mo to Aug 2026
Capacity factor33%wind units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 618.9 | 29.1% | — |
| 2022 | 640 | 30.1% | — |
| 2023 | 645.7 | 30.4% | — |
| 2024 | 635.3 | 29.8% | — |
| 2025 | 646.1 | 30.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| COY | Onshore Wind Turbine | WT | 242.5 | 242.5 | Jan 2021 | Operating | — | siemens gamesa SG 4.5-145 |
Owner / operator
Operator: EDF Renewable Asset Holdings, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EDF Renewable Asset Holdings, Inc. | 100.0% | 243 MW |
Nearby plants
Within 80 km.
| Dermott Wind | 253 MW | 10.3 km |
| TX13 Endurance Park Storage | 50 MW | 11.7 km |
| Lumina II Solar Project | 487 MW | 11.9 km |
| Lumina Solar Project | 487 MW | 12.3 km |
| EG178 Facility | 154 MW | 14 km |
| Cross Trails Energy Storage Project | 58 MW | 15.4 km |