← Back to map

Baldock Solar Highway

Clackamas County, Oregon · EIA plant ID 57882 · Operator: Portland General Electric Co
SolarSolar PhotovoltaicBA: PGE
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor8%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201220142016201820202022202420268.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2012213.2%—
20131.912.8%—
20142.114.2%—
2015213.3%—
20161.912.8%—
20171.913.0%—
2018213.5%—
2019213.3%—
20201.812.3%—
20211.912.8%—
20221.814.4%—
20231.310.8%—
20241.310.4%—
202518.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSH1Solar PhotovoltaicPV1.41.4Jan 2012Operating—coming soon

Owner / operator

Operator: Portland General Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Portland General Electric Co100.0%1 MW

Nearby plants

Within 80 km.
SSD Marion 6, LLC2 MW3.2 km
SulusSolar252 MW3.8 km
Coffee Creek BESS17 MW8.1 km
OR - Solops - SPI 18 - Dover2 MW10.1 km
BristolSolar3 MW13.4 km
Durham AWTF2 MW14.6 km