← Back to map

Morning Light Wind Farm

Adair County, Iowa · EIA plant ID 57875 · Operator: MidAmerican Energy Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate111MWSummer 101 MW
Generators1in service
Net generation407GWh12 mo to Dec 2025
Capacity factor46%wind units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2012201420162018202020222024202646.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201290.440.5%—
2013367.441.5%—
2014379.842.8%—
2015356.640.2%—
2016361.540.7%—
2017351.839.7%—
2018312.535.3%—
2019304.934.4%—
2020327.836.9%—
2021323.636.5%—
2022321.936.8%—
2023351.739.8%—
2024413.346.6%—
2025406.846.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MLWFOnshore Wind TurbineWT110.9100.9Oct 2012Operating—siemens SWT-2.3-108

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%111 MW

Nearby plants

Within 80 km.
Adair Wind Farm175 MW8.2 km
Wolverine2 MW12.8 km
Fontanelle2 MW12.8 km
Meadow Ridge2 MW12.9 km
Eclipse Wind Farm207 MW14.4 km
Anita3 MW16 km