← Back to map

ISH Solar Hospital Downey

Los Angeles County, California · EIA plant ID 57841 · Operator: Kaiser Permanente
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh20112012201320142015201620172018201920202021202220242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202614.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.411.2%—
20121.717.9%—
20131.717.5%—
20141.717.8%—
20151.110.9%—
20161.616.7%—
20171.516.0%—
20181.414.7%—
20191.212.6%—
20200.10.8%—
202100.0%—
202200.0%—
20241.414.0%—
20251.414.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.11.1Sep 2011Operating—coming soon

Owner / operator

Operator: Kaiser Permanente. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Kaiser Permanente100.0%1 MW

Nearby plants

Within 80 km.
Kaiser Downey1 MW0.5 km
Downey2 MW0.5 km
Center Hybrid60 MW2 km
Paramount Refineryretired3.5 km
Golden Springs Building C-11 MW6.6 km
JFC Slauson - SLLAX0711 MW6.7 km