Center Hybrid
Los Angeles County, California · EIA plant ID 56475 · Operator: Southern California Edison Co
Nameplate60MWSummer 57 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate18,475Btu/kWhfossil units, electric fuel, HHV
First online2007Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2007 | 8.1 | 5.9% | 10,636 |
| 2008 | 4.7 | 1.1% | 10,590 |
| 2009 | 3.4 | 0.8% | 12,617 |
| 2010 | 5.7 | 1.4% | 12,093 |
| 2011 | 6.7 | 1.6% | 11,410 |
| 2012 | 25 | 5.8% | 10,524 |
| 2013 | 20 | 4.7% | 9,058 |
| 2014 | 19.5 | 4.5% | 9,875 |
| 2015 | 28.8 | 6.7% | 10,094 |
| 2016 | 27.4 | 6.4% | 10,099 |
| 2017 | 22.7 | 5.5% | 10,890 |
| 2018 | 14.9 | 3.6% | 12,166 |
| 2019 | 10.4 | 2.5% | 12,343 |
| 2020 | 20.1 | 4.9% | 11,597 |
| 2021 | 22.6 | 5.5% | 11,284 |
| 2022 | 6.9 | 1.7% | 13,964 |
| 2023 | 4.3 | 1.0% | 15,432 |
| 2024 | 7.2 | 1.7% | 13,576 |
| 2025 | 2 | 0.5% | 18,475 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | GT | 49.8 | 47 | Sep 2007 | Operating | — | coming soon |
| BA1 | Batteries | BA | 10 | 10 | Dec 2016 | Operating | — | coming soon |
Owner / operator
Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Southern California Edison Co | 100.0% | 60 MW |
Nearby plants
Within 80 km.
| ISH Solar Hospital Downey | 1 MW | 2 km |
| Kaiser Downey | 1 MW | 2.5 km |
| Downey | 2 MW | 2.5 km |
| Golden Springs Building C-1 | 1 MW | 5 km |
| Golden Springs Building D | 1 MW | 5.2 km |
| Building F | 1 MW | 5.3 km |