← Back to map

RE Bagdad Solar I LLC

Yavapai County, Arizona · EIA plant ID 57790 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicBA: AZPS
Nameplate15MWSummer 15 MW
Generators1in service
Net generation30GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202623.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2011216.5%—
20123624.7%—
201334.323.6%—
201435.424.3%—
201534.126.0%—
201634.926.5%—
201734.126.0%—
201834.326.1%—
201932.724.9%—
202031.524.0%—
20212619.9%—
202228.822.1%—
202331.724.3%—
202431.323.9%—
202530.123.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV14.914.9Dec 2011Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Renewables Services100.0%15 MW

Nearby plants

Within 80 km.
Prescott Solar Plant11 MW69 km
Chino Valley Solar38 MW70 km
Prescott Airport3 MW71.5 km