Chino Valley Solar
Yavapai County, Arizona · EIA plant ID 57560 · Operator: Arizona Public Service Co
Nameplate38MWSummer 38 MW
Generators2in service
Net generation33GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 6.3 | 120.8% | — |
| 2013 | 49.5 | 29.7% | — |
| 2014 | 47.1 | 28.3% | — |
| 2015 | 46.5 | 27.9% | — |
| 2016 | 45.7 | 27.4% | — |
| 2017 | 41.7 | 25.1% | — |
| 2018 | 44.6 | 26.8% | — |
| 2019 | 44.8 | 26.9% | — |
| 2020 | 49 | 29.3% | — |
| 2021 | 46.8 | 28.1% | — |
| 2022 | 48.1 | 28.9% | — |
| 2023 | 26.3 | 15.8% | — |
| 2024 | 41 | 26.5% | — |
| 2025 | 33.1 | 21.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CV19M | Batteries | BA | 19 | 19 | Jan 2024 | Operating | — | coming soon |
| PV1 | Solar Photovoltaic | PV | 19 | 19 | Dec 2012 | Operating | — | coming soon |
Owner / operator
Operator: Arizona Public Service Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Arizona Public Service Co | 100.0% | 38 MW |
Nearby plants
Within 80 km.
| Prescott Airport | 3 MW | 7.2 km |
| Prescott Solar Plant | 11 MW | 7.7 km |
| RE Bagdad Solar I LLC | 15 MW | 70 km |
| Perrin Ranch Wind LLC | 99 MW | 78.8 km |