Watkins Manufacturing Co.

San Diego County, California · EIA plant ID 57715 · Operator: Watkins Manufacturing Corporation
Natural gasNatural Gas Internal Combustion EngineCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators2in service
Net generation8GWh12 mo to Aug 2026
Capacity factor43%gas/coal/oil units, summer MW
Heat rate12,841Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as intermediate

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2012201420162018202020222024202643.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002012201420162018202020222024202612,841 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201100.0%24,490
20123.419.1%23,914
20133.218.0%26,157
20142.916.4%—
20150.63.5%—
20164.324.4%20,445
20173.318.9%22,239
20183.620.6%20,670
20192.514.4%19,689
20205.430.8%12,732
2021739.9%12,658
2022951.3%12,664
20234.726.6%12,678
20245.430.8%12,588
20257.442.2%12,856

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Internal Combustion EngineIC11Nov 2001Operating—coming soon
GEN2Natural Gas Internal Combustion EngineIC11Nov 2001Operating—coming soon

Owner / operator

Operator: Watkins Manufacturing Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Watkins Manufacturing Corporation100.0%2 MW

Nearby plants

Within 80 km.
Life Technologies Carlsbad1 MW4.7 km
San Diego - NCRC at Vista2 MW5.4 km
Vista Energy Storage System 40 MW6.9 km
Legoland CA Phase I1 MW6.9 km
Melrose BESS20 MW7.2 km
Encina Water Pollution Control3 MW8.4 km