Linden Wind Energy Project

Klickitat County, Washington · EIA plant ID 57635 · Operator: Los Angeles Department of Water & Power
WindOnshore Wind TurbineBA: BPAT
Nameplate50MWSummer 50 MW
Generators1in service
Net generation104GWh12 mo to Dec 2025
Capacity factor24%wind units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202623.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2011151.234.5%—
2012141.632.2%—
2013149.234.1%—
2014147.533.7%—
2015132.630.3%—
2016142.532.4%—
2017119.127.2%—
2018139.631.9%—
2019123.528.2%—
2020105.223.9%—
2021122.628.0%—
2022119.227.2%—
2023116.726.6%—
202496.522.0%—
2025104.323.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LW1Onshore Wind TurbineWT5050Jun 2010Operating—senvion MM92

Owner / operator

Operator: Los Angeles Department of Water & Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern California P P A100.0%50 MW

Nearby plants

Within 80 km.
Windy Flats Wind Project262 MW4.4 km
John Day2,160 MW7.6 km
Goldendale Generating Station303 MW8.4 km
Tuolumne Wind Project136 MW15.2 km
Carriger—16.9 km
Biglow Canyon Wind Farm450 MW17.2 km