Cana Gas Processing Plant
Canadian County, Oklahoma · EIA plant ID 57597 · Operator: EnLink Midstream Services, LLC
Nameplate8MWSummer 8 MW
Generators3in service
Net generation1GWh12 mo to Aug 2026
Capacity factor2%gas/coal/oil units, summer MW
Heat rate9,610Btu/kWhfossil units, electric fuel, HHV
First online2010Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 0 | 1.0% | 9,184 |
| 2011 | 0.2 | 1.4% | 9,215 |
| 2012 | 0 | 0.0% | — |
| 2013 | 0.4 | 0.6% | 10,313 |
| 2014 | 0.3 | 0.4% | 9,599 |
| 2015 | 1.7 | 2.6% | 9,584 |
| 2016 | 0.7 | 1.0% | 9,618 |
| 2017 | 0.9 | 1.3% | 9,622 |
| 2018 | 1 | 1.6% | 9,615 |
| 2019 | 1.4 | 2.2% | 9,620 |
| 2020 | 1.1 | 1.7% | 9,617 |
| 2021 | 0.7 | 1.0% | 9,604 |
| 2022 | 1.4 | 2.2% | 9,608 |
| 2023 | 1.7 | 2.6% | 9,613 |
| 2024 | 2.7 | 4.2% | 9,618 |
| 2025 | 1.6 | 2.4% | 9,617 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 3005 | Petroleum Liquids | IC | 2.5 | 2.5 | Sep 2010 | Operating (Standby / backup) | — | coming soon |
| 3006 | Petroleum Liquids | IC | 2.5 | 2.5 | Sep 2010 | Operating (Standby / backup) | — | coming soon |
| 6214 | Petroleum Liquids | IC | 2.5 | 2.5 | Apr 2012 | Operating (Standby / backup) | — | coming soon |
Owner / operator
Operator: EnLink Midstream Services, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EnLink Midstream Services, LLC | 100.0% | 8 MW |
Nearby plants
Within 80 km.
| Canadian Hills Wind | 294 MW | 12.8 km |
| Minco Wind III, LLC | 101 MW | 19.3 km |
| Minco Wind IV, LLC | 130 MW | 22.8 km |
| Minco Wind II, LLC | 101 MW | 23.3 km |
| Rumble Solar | — | 23.9 km |
| Hinton | 3 MW | 26.1 km |