← Back to map

Cantua Solar Station

Fresno County, California · EIA plant ID 57522 · Operator: Pacific Gas & Electric Co
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation23GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202613.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201224.223.6%—
201348.227.5%—
201443.224.7%—
201542.524.3%—
201643.824.9%—
201739.822.7%—
201842.224.1%—
201940.423.0%—
202042.424.1%—
202140.423.0%—
202236.620.9%—
202333.919.4%—
202431.217.8%—
20252313.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2020Jun 2012Operating—coming soon

Owner / operator

Operator: Pacific Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pacific Gas & Electric Co100.0%20 MW

Nearby plants

Within 80 km.
Superior Almond Hulling2 MW4.4 km
Five Points Solar Park60 MW10.5 km
Darden II Solar—11.2 km
Giffen10 MW12 km
Giffen Solar Park20 MW13.5 km
Aspiration G9 MW14.2 km