Blue Ridge Landfill
Franklin County, Pennsylvania · EIA plant ID 57466 · Operator: EPP Renewable Energy
Nameplate6MWSummer 6 MW
Generators4in service
Net generation42GWh12 mo to Dec 2025
Capacity factor74%other units, summer MW
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 49.9 | 89.0% | — |
| 2014 | 51.4 | 91.7% | — |
| 2015 | 48 | 85.6% | — |
| 2016 | 50.1 | 89.1% | — |
| 2017 | 48.7 | 86.9% | — |
| 2018 | 48.6 | 86.7% | — |
| 2019 | 50.4 | 89.9% | — |
| 2020 | 46.1 | 82.0% | — |
| 2021 | 41.9 | 74.7% | — |
| 2022 | 46 | 82.0% | — |
| 2023 | 45.9 | 81.9% | — |
| 2024 | 46 | 81.8% | — |
| 2025 | 41.7 | 74.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2013 | Operating | — | coming soon |
| GEN2 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2013 | Operating | — | coming soon |
| GEN3 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2013 | Operating | — | coming soon |
| GEN4 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2013 | Operating | — | coming soon |
Owner / operator
Operator: EPP Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EPP Renewable Energy | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| Maple Ridge A | — | 6.8 km |
| Maple Ridge B | — | 6.8 km |
| Falling Spring | 7 MW | 8.7 km |
| Orchard Park | 24 MW | 10.6 km |
| Allegheny Energy Units 12 & 13 | 88 MW | 15 km |
| Whitetail Solar 1 | 14 MW | 15.9 km |