Natural gasNatural Gas Internal Combustion EnginePJMBA: PJM
Nameplate24MWSummer 23 MW
Generators4in service
Net generation48GWh12 mo to Aug 2026
Capacity factor24%gas/coal/oil units, summer MW
Heat rate9,725Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2005201020152020202523.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,00011,000200520102015202020259,725 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20030.95.4%11,007
200423.712.0%8,852
200534.417.5%8,902
2006136.7%9,017
200720.610.5%9,383
200819.69.9%8,876
200952.5%8,874
201011.95.8%9,217
201142.0%9,802
20122.41.2%8,700
201331.5%8,239
201483.9%9,026
20153.61.8%9,106
201612.15.9%9,131
20175.92.9%9,301
201873.5%8,896
20193.31.6%9,056
20204.12.0%9,072
202111.85.8%9,174
202233.816.6%9,251
202316.28.0%9,043
202425.512.5%9,072
202549.824.5%9,593

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10Natural Gas Internal Combustion EngineIC65.8Dec 2003Operating—coming soon
11Natural Gas Internal Combustion EngineIC65.8Dec 2003Operating—coming soon
8Natural Gas Internal Combustion EngineIC65.8Dec 2003Operating—coming soon
9Natural Gas Internal Combustion EngineIC65.8Dec 2003Operating—coming soon

Owner / operator

Operator: Borough of Chambersburg. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Borough of Chambersburg100.0%24 MW

Nearby plants

Within 80 km.
Falling Spring7 MW3.2 km
Allegheny Energy Units 12 & 1388 MW5.2 km
Maple Ridge B—7.6 km
Maple Ridge A—7.6 km
Whitetail Solar 320 MW9.5 km
Blue Ridge Landfill6 MW10.6 km